Buyer's Guide

Kitchen remodeling where every detail has to be right.

Licensed California design-build remodels for kitchens that work the way you live. Fixed-scope written plan, permits pulled, weekly progress updates, 10-year workmanship warranty.

The Reality Check

What a kitchen remodel typically costs in California.

Most CaliFirst kitchen remodels range from $35,000 to $150,000. Active construction runs 5 to 9 weeks of active construction. We quote after design, site review, and permit requirements are confirmed.

Finishes & materials

What we install.

  • Custom white shaker or walnut cabinetry
  • Honed quartz, Calacatta marble, or butcher block countertops
  • Full-height subway-tile or large-format slab backsplash
  • Stainless professional gas range and integrated panel-ready appliances
  • Brushed nickel and aged brass mixed hardware
  • Wide-plank engineered oak hardwood flooring
  • Fireclay farmhouse or undermount stainless sinks
Kitchen remodel detail

The unseen work

How a kitchen remodel actually unfolds.

  1. 01

    Design & scope lock

    Written fixed-scope plan with materials, schedule, and price before demo.

  2. 02

    Permitting

    Submittals, Title 24, plan check, and inspection scheduling through your city.

  3. 03

    Utility & structural

    Foundation, framing, MEP rough-in — the unseen work that makes finishes last.

  4. 04

    Finish & reveal

    Cabinetry, counters, fixtures, punch list, and final walkthrough.

Serving all of California

Kitchen remodeling near you.

Southern California

San Francisco Bay Area

Questions we get

About kitchen remodels.

How much does a kitchen remodel cost in California?
Most CaliFirst kitchen remodels range from $35,000 to $75,000 for thoughtful updates; custom design-build kitchens with structural changes, premium cabinetry, and professional appliances often run $75,000 to $150,000+. We price every project after design, site review, material selection, and permit requirements are confirmed — no quotes from a photo.
How long does a kitchen remodel take?
Active construction typically runs 5 to 9 weeks once design is locked, materials are ordered, and permits are pulled. Structural changes, custom cabinetry lead times, and specialty tile can extend the schedule. We commit to a written schedule before demo begins and update you weekly.
Do I need a permit for a kitchen remodel?
California requires permits for any electrical, plumbing, gas, or structural work — which means most full kitchen remodels need them. CaliFirst pulls every required permit through your city's building department as part of the Fixed-Scope Remodel Plan. We handle inspections.
Can I live in my home during a kitchen remodel?
Yes, in most cases. We set up a temporary kitchen space, install dust containment, protect adjacent floors, and stage materials to minimize disruption. For full-gut renovations or whole-home projects, some clients choose to relocate for the demo and rough-in phases.
What's included in the CaliFirst Fixed-Scope Remodel Plan?
A written document covering the full scope of work, materials list with finish selections, schedule with weekly milestones, total price, and warranty terms. You approve every line item before construction begins. No change orders mid-project unless you request them.

Ready for a fixed-scope plan?

On-site visit. Written plan in your hand. No pressure.

Call (888) 533-3182Consultation